Tiles are chosen in a showroom and succeed or fail on the floor underneath them. We brief tilers on the base, the membrane and the falls, and we check whether your building lets the old tiles come up.
Bathroom tiles in Dubai: what the tiler is really pricing
Bathroom tiles in Dubai are bought from a showroom and laid by a tiler, and this page is about the second part. The tiler's price covers preparing or removing the old surface, the screed and the falls, the waterproof membrane in the wet areas, the adhesive, the grout and the finish at every edge. The tiles themselves are a separate allowance that you control.
How much does bathroom tiling cost in Dubai?
Bathroom tiling in Dubai is priced inside the bathroom job: one UAE company's published villa bathroom row of AED 12,000 to 35,000 covers waterproofing, fixtures and tiles together, and full renovations that include tiling start at AED 8,000 per bathroom. No company publishes a per-square-metre tiling rate for bathrooms that we would rely on, so we ask for the tile allowance and the laying cost as two separate figures.
Can you lay new bathroom tiles in Dubai over the old ones?
Often you have to. Emaar's rules for apartments do not permit removing existing tiles, and they allow new tiles to be laid over them. Town Square's apartment manual takes the same line, except on balconies. So in many Dubai apartments, retiling means overlay: the old tiles stay as the base and the new ones are bonded on top.
Overlay works when the old tiles are sound and well bonded, so the tiler taps for hollow spots before anything is quoted. It also lifts the floor by the thickness of the new tile and its adhesive, which changes three things: whether the door still clears, how the floor finishes at the threshold, and where the drain grating sits. Walls are simpler, because the extra thickness shows only at the edges, the sockets and the mixer plates.
Retiling a Dubai bathroom: what the community rules allow, September 2026
Dubai Holding application, except for maintenance or repair; gate pass needed
Dubai Holding application, except for maintenance or repair; gate pass needed
Retiling a Dubai bathroom: what the community rules allow, September 2026
Tilal Al Ghaf also runs every alteration plan through a review priced at AED 5,000 plus AED 250 VAT. At the other end of the scale, Town Square treats SPC planks laid over the existing tiles as a home improvement item at AED 160, a route our powder room page weighs against tiles.
Porcelain is the usual answer for floors: it is dense, absorbs very little water and comes in matt or textured finishes that grip when wet. Glazed ceramic suits walls better than shower floors. Natural stone such as marble looks the part but is porous, so it needs sealing when laid and again later, and some cleaners etch it. Large-format tiles cut the number of grout lines, but they need a flat base and are harder to lay to falls inside a shower.
Grout is the other half of the surface. Cement grout is the standard and takes up water unless it is sealed; epoxy grout resists staining and water but is harder to lay neatly. In a shower, the grout type deserves as much thought as the tile.
What goes under bathroom tiles?
A sound base: old tiles checked for hollow spots, or the floor stripped to the slab, depending on what the building allows.
A screed laid to falls in the shower area, so water runs to the drain instead of sitting under the tiles.
A waterproof membrane across the wet zone and turned up the walls, with the corners and the drain joint reinforced.
A water test before tiling, with the membrane left flooded long enough to show any leak on the ceiling below.
The right adhesive for the tile and the location, spread so that no voids are left under the tile.
Dubai Municipality lists insulation works among the simple maintenance jobs that need no permit when an accredited contractor does them. In Sharjah, on the projects a consultant files, the consultant commits to ensuring all kinds of insulation works through supervision and follow-up. Either way, the membrane is the line to read first in a tiling quote, and our walk-in shower page covers the floor falls in more detail.
Does retiling a bathroom need approval?
Not from Dubai Municipality, if an accredited contractor does it: replacing floors is on its list of simple maintenance. From the community, it depends on the route in the table above, and the approval tier follows the method. In Abu Dhabi a like-for-like retile falls under the maintenance permit the contractor files, and the government portal even carries a villa maintenance permit named for paint and ceramic work.
Tiling is one trade in a bathroom. The full bathroom page explains how we compare complete quotes, and the price bands show what a whole room costs at each finish level.
New tiles bonded to sound old ones, where the building keeps the old floor in place. The old tiles are checked for hollow spots first, and the door, the threshold and the drain grating are adjusted for the higher floor.
Old floor stays
Hollow spots checked
Door and drain adjusted
Priced after a survey
Strip out and retile
Old tiles and screed removed, a new screed laid to falls, a membrane in the wet zone and new tiles on floor and walls. One published villa bathroom row covering waterproofing, fixtures and tiles runs AED 12,000 to 35,000.
New screed and falls
New membrane
Floor and walls
AED 12,000 to 35,000 per bathroom
Tiling in a full renovation
Tiling as one trade in a complete rebuild, laid after the plumbing and the membrane and before the vanity and the glass. Full renovations start at AED 8,000 per bathroom.
Yes, if matching or complementary tiles are available and the membrane under the shower can be renewed without disturbing the rest. The joint between old and new work is the risk, so ask how the new membrane is lapped under it.
Is tiling over tiles the cheaper option?
It takes the strip-out and the waste removal off the quote, which is where any saving comes from. Where the building does not allow the old floor to be lifted, as in Emaar and Town Square apartments, it is the only option anyway.
Do bathroom walls need waterproofing too?
Around the shower, yes: the membrane turns up the walls of the wet zone and goes higher where the spray lands. Away from the shower, wall tiles mainly need a sound, flat base and a well-filled grout joint.
What should a tiling quote list?
The preparation, overlay or strip-out; the screed and the falls; the membrane and its water test; the adhesive and the grout type; the tile allowance per square metre; and how edges, corners and the drain are finished. A single figure for tiling leaves all of that open.
Who can tile a bathroom in Dubai?
A contractor accredited with Dubai Municipality, if the job is to stay on the no-permit maintenance route. In Nakheel villa communities the contractor also needs a gate pass, and in Emaar communities an entry permit through ecmpermits.ae, even where no NOC applies.
Who you are dealing with
OperatorWebsiteOS LLC
Licence2646567.01
Cost to homeownerNone
Figures datedSeptember 2026
Tell us about the tiling
The bathroom, the community, and whether the old tiles can come up. We come back with contractors who quote against the published bands, and show you where each quote sits against them.